Harry Tracy Water Treatment Plant

Updates to the facility to improve capacity and maximize reliability.

BIM MANAGEMENT

OVERVIEW

The Harry Tracy Water Treatment Plant in San Bruno, CA required a major update to make the facility more seismically sound, to improve water treatment capacity and maximize overall reliability.

After being awarded the large contract to lead the reconstruction project, Kiewit Infrastructure Group immediately turned to Digital Building Services knowing the current drawings were outdated and unreliable for the required structural calculations.

BIM at water treatment plant
BIM at water treatment plant
BIM at water treatment plant

3D MODELING AND BIM

One of the project subcontractors, Green Street Engineering, LLC. initially requested that DBS provide 2D drawing sheets in lieu of 3D modeling or a complex BIM. We suggested a hybrid solution which turned out to be ideal for the clients.

Our company produced a set of 2D drawings enabling workers in the field to easily document the MEP elements that required reinforcement by simply reviewing the drawings in the field and adding notes to the Innovtec drawings.

Additionally, we provided 2D cross-section views, which combined with 3D TruView point cloud images provided the needed data for structural calculations. The structural engineers also used the TruView images to safely inspect pipe connection types allowing them to accurately specify and design the correct bracing.

Using this procedure enabled the manufacture and installation of the seismic retrofit without errors and ahead of schedule.

PROJECT RESULTS

DBS  developed highly effective and cost conscious solutions to this demanding project by understanding the needs of its clients. The field scanning operations were completed in one day, the TruViews were submitted two days later and the final 2D drawings two weeks after that.